Project: MTM – Burnley Station Accessibility Improvements Project

Burnley Station Accessibility Upgrade Enhances Safety, Access and Connectivity for Growing Passenger Demand

Metro Trains Melbourne (MTM), on behalf of the Department of Transport and Planning (DTP), delivered the Burnley Station Accessibility Improvements Project to enhance accessibility, safety and passenger amenity throughout the station underpass and ramp network.

On behalf of the Department of Transport and Planning (DTP), Metro undertook accessibility upgrade works at Burnley Station to improve connectivity and user experience, in conjunction with Australia Post’s relocation of 3000 employees to its new headquarters adjacent to the station.

This project formed part of a broader initiative to enhance customer amenity and accessibility at key stations across the metropolitan rail network.

As part of this program, Global Rail Australia was engaged to deliver infrastructure upgrades aimed at improving compliance, safety, and access.

PROJECT SCOPE:

Ramp & Underpass Accessibility Upgrades

  • Demolition and replacement of non-compliant handrails with approximately 420m of galvanised steel handrails and kickplates across Ramps A–E and the full underpass.
  • Removal, cleaning, and reinstatement of selected existing drain covers at ramp landings.
  • Installation of new compliant drain covers at pump pit access areas to resolve clash issues with newly installed kickplates.

Lighting Works

  • Replacement of 18 wall-mounted underpass light fittings with compliant LED luminaires, maintaining existing conduits and cabling.
  • Installation of 1 new wall-mounted LED light in the underpass between Ramps C and D.
  • Upgrade of 8 pole-mounted luminaires on Ramps A, B, and E using existing infrastructure.

Painting & Surface Renewal

  • Surface preparation and full painting of underpass walls and ceilings, and all associated ramps (~920m²).
  • Resurfacing of Ramps and Landings, including:
    • Ramp B (~60m²)
    • Top landings of Ramps A and E (~10m² each)
    • Installation of new tactile indicators at resurfaced landings.

CCTV & Wayfinding

  • Installation of 3 new dual-head vandal-proof dome CCTV cameras, with new conduits and cabling.
  • Installation of updated static wayfinding signage across underpass and ramp network, based on DTP-provided artwork.

Furniture & Fixtures

  • Replacement of non-compliant bench seating at Platform 01/02 and 03/04 waiting areas.
  • Installation of new wheelchair/mobility aid markings.
  • Replacement of 7 existing blind corner mirrors and installation of 1 additional to complement the new CCTV coverage.
  • Relocation of bins and vending machines (no cost to project).
  • Replacement of damaged concrete pit lid near Ramp D

Client: Metro Trains Melbourne

Location: Melbourne

Date: January 2025 – April 2025